Sorting job site leads by stage: a territory rep's triage

An empty rural road running alongside open green farmland under a wide sky.

If you cover a county or two, your pipeline runs twenty to sixty permitted parcels at any given time, and you can make eight to ten real calls a week. The list is never the problem. Knowing which five names on it are worth a drive-by this week and which forty are still paper is the problem.

Most reps default to sorting by project size, because a 200-unit multifamily job feels more important than a six-bay strip center. Size matters for the deal once it's live, but it says nothing about timing, and timing decides if you're first in the door or fourth.

Sort by stage, not by square footage

A permit that cleared the building department six months ago and a permit that cleared last week can sit on the same list looking identical. They're not. The useful split is three buckets:

  • Permitted, no activity. Entitlements are done but nothing's happened on the parcel. Could be weeks out, could be next spring if financing stalls.
  • Mobilized. Trailers, fencing, maybe a grading contractor's truck parked on site. Dirt hasn't moved yet, but someone's spending money to get ready.
  • Earthwork underway. Topsoil's been scraped, cut-and-fill is happening, the site looks like a construction site from the road.

The window where a call lands well is narrow, and it sits right around that second and third bucket. Call too early and the GC hasn't locked a sitework contractor yet, so your pitch has nowhere to go. Call after the dirt's been moving for three weeks and the aggregate, erosion control, and rental orders may already be placed with whoever got there first.

Three signals worth checking before you build the week's call list

  1. Permit age. How long a permit has sat matters most. A six-week-old permit with no visible activity is a different lead than one that's been open since last winter.
  2. Visible mobilization. Fencing, silt fence, a construction entrance pad going in. These are the tells that someone's about to start moving dirt, and they show up before the first load of topsoil does.
  3. Your own last touch. If you drove past a parcel three weeks ago and it was still a cornfield, that's a data point. Drive past again if it's been longer than that: the gap between flat ground and a real grading operation usually runs two or three weeks.

The trouble with all three signals is they're manual. Permit age you can pull from a county database. Mobilization and current ground condition you mostly get by driving, which doesn't scale past the parcels on your regular route.

Why topsoil moving is the better trigger than permit date

Permit date tells you a project exists, nothing about when to call. The gap between permit issuance and ground-breaking runs anywhere from a few weeks to the better part of a year depending on financing, subcontractor availability, and weather, and that gap is exactly why permit-based lead lists go stale. You end up re-checking the same forty parcels every month because you have no way to know which ones changed since your last pass.

The moment the first scrape of topsoil happens is a cleaner trigger. It means the GC has a sitework contractor on-site, which means decisions about aggregate supply, erosion control, and rental equipment are either being made now or were made in the last couple of weeks. That's the window a supplier rep wants to be inside of.

This is the gap Earthworks Alerts is built around: instead of driving routes or re-checking permit boards, it watches the parcels you're tracking and flags the week topsoil gets disturbed, with a dated before/after image so you know it's real and not a lawn-mowing pass. That turns "which forty parcels should I check this week" into a short list that updates itself.

If your territory has more permitted parcels than you can physically drive past every week, that's worth a look.